|
No: |   | Zur |   Traject |   Zur23 |   KM |   Naam | Hoogte MuM | Lengte tunnel | Lengte brug |
  1 |  |  |  |  |  |  |  |  |   0.000 |  |   Ouchy (Zahnradbahn) |   373.0 |   |   |
  3 |  |  |  |  |  |  |  |  |   0.300 |  |   Jordils (Zahnradbahn) |   392.0 |   |   |
  4 |  |  |  |  |  |  |  |  |   0.600 |  |   Montriond (Zahnradbahn) |   420.0 |   |   |
  7 |  |  |  |  |  |  |  |  |   |  |   Anfang tunnel ZR5 |   |   |   |
  8 |  |   210 |  |  |  |  |  |  |   |  |   nach Biel |   |   |   |
  9 |  |   150 |  |  |  |  |  |  |   |  |   nach Geneve |   |   |   |
  10 |  |  |  |  |  |  |  |   102 |   |  |   Metro M2 nach Ochy |   |   |   |
  11 |  |  |  |  |  |  |  |  |   1200 |  |   Lausanne |  |   447.1 |   |   |
  12 |  |  |  |  |  |  |  |  |   1200 |  |   Lausanne-Gare (Zahnradbahn) |   452.0 |   |   |
  13 |  |  |  |  |  |  |  |  |   |  |   Lausanne-Gare (M2) |   452.0 |   |   |
  14 |  |  |  |  |  |  |  |   250 |   |  |   nach Bern |   |   |   |
  15 |  |  |  |  |  |  |  |   100 |   |  |   nach Brig |   |   |   |
  16 |  |  |  |  |  |  |  |   102 |   |  |   Metro M2 nach Epalinges-Croisettes |   |   |   |
  17 |  |   101 |  |  |  |  |  |  |   |  |   nach Bercher |   |   |   |
  18 |  |   203 |  |  |  |  |  |  |   |  |   nach Renens M1 |   |   |   |
  19 |  |  |  |  |  |  |  |   102 |   |  |   Zahnradbahn nach Ochy |   |   |   |
  20 |  |  |  |  |  |  |  |  |   1500 |  |   Lausanne-Flon (M2) |   473.0 |   |   |
  21 |  |  |  |  |  |  |  |  |   1500 |  |   Lausanne-Gare (Zahnradbahn) |   452.0 |   |   |
  22 |  |  |  |  |  |  |  |  |   1500 |  |   Lausanne Flon |  |   472.0 |   |   |
  23 |  |  |  |  |  |  |  |  |   1500 |  |   Lausanne-Flon (M1) |  |   479.0 |   |   |